200 Ton Cement Silo Project

2017-07-17

 200 ton mobile cement storage silo for the road building project has been finished, which mobile silo is finished at seven days with diamter of 4.5 m and height of 13 m. This mobile cement silo is equipped with level sensor to monitor the timely material level, dust collector to reach the local environment requirement, safety valve to release the pressure inside silo.